Quantcast
Channel: Central Govt Employees News – 8th Pay Commission – Staff News
Viewing all articles
Browse latest Browse all 11682

Restructuring of Senior Engineer ( IT) and Junior Engineer(IT) posts of IT Cadre in Zonal Railways/Production Units

$
0
0
Restructuring of Senior Engineer ( IT) and Junior Engineer(IT) posts of IT Cadre in Zonal Railways/Production Units

(भारत सरकार) GOVERNMENT OF INDIA
(रेल मंत्रालय) MINISTRY OF RAILWAYS
(रेलवे बोर्ड) RAILWAY BOARD
RBA No 22/2019

No. 2016/AC-II(CC)/37/9
28-3-2019

General Managers,
All Zonal Railways and Production Units (including RDSO)

Sub:- Re-Structuring of IT Cadre in Zonal Railways/Production Units.
Ref:- Board 's letter of even No. dated 18.04.2017 (RBA 45/2017). 
[post_ads]
Further to the instructions issued vide Board's letter ibid, the matter regarding restructuring of Senior Engineer ( IT) and Junior Engineer(IT) 's post of IT Cadre in Zonal Railway s/Production Units has again been reviewed in the Ministry of Railways and it has now been decided with the approval of competent authority, that the cadre re-structuring of the post of Senior Engineer (IT) and Junior Engineer(IT) of IT Cadre, earlier approved on the basis of operated strength as on 1.4.2017 in the ratio of 67:33 respectively, shall now be done on the basis of Sanctioned Strength of Senior Engineer (IT) and Junior Engineer (IT) w.e.f. 1.4.2017. The entire up-gradation has to be revenue neutral. Accordingly, the revised sanctioned strength of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre in Zonal Railways/Production Units as on 1.4.2017 after restructuring duly taking into account the surrender of JE/ IT posts shall be as under :-

S.NoZonal Railway/Production UnitRevised Sanctioned Strength after restructuring w.e.f 1.4.2017
JE/ITSE/ITTotal
1Central Railway235073
2Eastern Railway4951100
3Northern Railway445094
4North Eastern Railway203757
5North East Frontier Railway89098
6Southern Railway203757
7South Central Railway135164
8South Eastern Railway276592
9Western Railway103343
10North Western Railway101828
11West Central Railway02222
12East Cost Railway31014
13East Central Railway11617
14South Western Railway8412
15North Central Railway163147
16South East Central Railway53742
17Diesel Modernisation Works, Patiala189
18Rail Wheel Factory, Bengaluru01414
19Chittaranjan Locomotive Works123143
20Diesel Locomotive, Varanasi13132
21Integral Coach Factory74047
22Central Organisation for Railway Electrification011
Total
2787891067

3. Surrender of Post in JE/IT will be effected before implementing above mentioned cadre restructure orders and the resultant imbalance/variation in the cadre due to surrender of posts of JE/IT shall be reviewed at the time of next annual review of the cadre after implementation of cadre restructuring.
[post_ads_2]
4. Zonal Railways/Production Units may update the book of sanction as per the above sanctioned post w.e.f 1.4.2017..

5. All the other terms and condition mentioned in Board's letter ibid remain unchanged.

Sd/-
(Gaisingam Kabui) 
Director Finance/CCA,
Railway Board

Source: Click here to view/download the PDF
[http://www.indianrailways.gov.in/railwayboard/uploads/directorate/accounts/downloads/Compendium_2019/42%20rba%2022_28032019.pdf]

Viewing all articles
Browse latest Browse all 11682

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>